Azizi Developments has confirmed almost 94 per cent of the work has been accomplished at its luxurious residential improvement, Mina.
The property is positioned on the east crescent of the long-lasting Palm Jumeirah.
The construction, blockwork and inner plaster are 100 per cent full, whereas the tiling, heating, air flow and air-conditioning, mechanical, electrical and plumbing, façade works, and elevator works are all 99 per cent full.
The swimming pool and total completed at the moment are over 95 per cent full, with exterior works now standing at 80 per cent.
Providing almost 38,500 sq. metres of built-up space, Mina options 178 models, comprising 120 one-bedroom flats, 54 two-bedroom residences, and 4 spacious, lavishly designed penthouses scheduled to be accomplished inside quarter three of 2020, stated the assertion from Azizi.
On the important thing achievement, govt director, gross sales and advertising and marketing, Nima Khojasteh stated: “Mina, located on the serene east crescent of the eighth surprise of the world – the marvellous archipelago that’s iconic to Dubai, enjoys a excessive demand from each native residents and worldwide traders who worth the life-style it embodies.
“Seeing this challenge being finalised fills us with immense satisfaction.
“We look ahead to its completion and are thrilled handy over the keys to our valued clients within the coming months,” he acknowledged.
The challenge embodies a really unique, privileged, and resort-like life-style that enriches the lives of its residents, and is a manifestation of Azizi Growth’s customer-centricity, consideration to element, and contributions to the event of the United Arab Emirates’ awe-inspiring panorama, he added.